5.Document Summary

WJE Analysis >
AVELAR Submitted Plans >
  • Identified requirements

    • Categories of Requirments

    • Safety Issues Resolved

    • Identified High and Medium EEE

    • Addition Cautionary Information

  • The board entertained 3 Envelope Bids

    • Selected AVELAR to produce the architectural drawings,

    • Obtain contractor bids

    • Quality control of the work

Provide a general summary of the services you provide, highlighting key features and benefits for potential clients.

FA Question to AVELAR /Bidders >
FA Deck Bid Analysis >
Deck Repair Specification Plans >
  • Review of Contractor bids

    • Could not substantiate consistent bid details to contractors

    • Questions for AVELAR

    • Questions for Bidders

    • Bid, contract & QC on hold

  • Identified a minimum of $5M Deck work

    • Could not substantiate consistent bid information between contractors

    • Produced a wide range of bids

    • QVC likely aware of conditions

  • AVELAR Deck Plans

    • Repair of WJE identified High Priority

    • Specification Requirments

    • Omits adjacent rot areas

Proforma Cost Renovation Calcs >
  • Developed a proforma of CBER costs

    • Breakdown of project costs

    • Breakdown of each building

    • Calculated CBER costs

    • Calculated cladding alternative

    • Note this is an Excel view file, you can move the columns to review if need required.

Satellite Envelope Drawings >
  • Identified requirements

    • Categories of Requirements

    • Safety Issues Resolved

    • Identified High and Medium EEE

    • Addition Cautionary Information

    • Each type of model building was completed in the same manner

Board Presentation Overview >
  • Documents, bids, and imagery were used to obtain data required to provide the board with an overall briefing

    • WJE & AVELAR documents

    • Satellite used for measurements of the several Harbortown buildings

    • Capital requirements with the use of factual information

  • Review of the envelope analyses

    • Executive Summary

    • Explanation of conditions

    • Pictures and notes

Invasive Envelope Analysis
an abstract photo of a curved building with a blue sky in the background

You have reviewed a majority of the material. Our next step is to review the options. In effect, the Board is at the fork in the road. Decisions need to be made, and the next page will offer insight into some practical options.